2009 Update
Prepared for:
By:
Floyd County Planner’s Office, March 2009
Table of
Contents
ACKNOWLEDGEMENTS
TABLE OF CONTENT
EXECUTIVE SUMMARY
STATEMEN OF POLICIES
INTRODUCTION
INVENTORY AND ANALYSIS
Regional Context
History
of
Social and Economic Characteristics
Existing Transportation Patterns
Existing Land Use and Development Framework
LAND USE PLAN
Proposed Land Use Element
Transportation Element
GOALS, OBJECTIVES, IMPLEMENTATION PLAN
Implementation Policy
Goals, Objectives, and Strategies
APPENDIX
A
Acknowledgement
The Town would
like to acknowledge those who participated in the Comprehensive Plan process
for
Council Member Ward 1: Randal Johnes
Council Member Ward 2: Talbotte Richardson
Council Member Ward 3: Hanzel Barclay
Council Member At Large: Patty Hayes
Council Member At Large: Bob Wright
Clerk / Treasurer: Jack Travillian
Edna Kubala
Executive Summary
The
Town's Comprehensive Plan is the chief tool to enable the management of growth
and the delivery of public services in a timely and efficient manner for its
citizens. For many years,
New
residents are attracted by a distinctness that is not found elsewhere in the
region - the topography and rural heritage, a rich sense of community, numerous
historic homes, and a quality of life that is not expected in this day and age.
In order to maintain this setting, it is important to plan for the future.
Planning
is a process of formulating goals and the land use policies necessary to
achieve them. The Town's Comprehensive Plan is a valuable tool to Town
government, its citizens and the private sector. It is an articulation of
policy from the Town Council which describes a vision for the future which
allows the Council and the Town’s Municipal Planning Commission to coordinate
their policies and actions to guide Town development. The major purposes of the
Comprehensive Plan are to:
·
Provide a guide for
the decisions that create the future Town environment;
·
Promote the interests
of the citizens at-large;
·
Enhance the Town's
environmental resources;
·
Develop a coordinated,
well-planned system of public services and utilities; and evaluate short-term
actions against long-term goals.
The
major issue facing
Land Use Plan
Recent
economic and housing conditions have created an environment where expansive
residential growth is seen to be limited. Population projects suggest that the
population of
The
Town's housing stock has changed considerably in recent decades. The central
town area has mostly single-family historic homes built prior to 1980. Newer
homes have been built surrounding the town.
In
comparing the town’s median age to that of the county and nation, we used
American Community Survey data from 2000.
The
Town should prepare to accommodate the housing needs of a graying community. The
Town should explore special initiatives for that particular group by obtaining
grants for housing rehabilitation and new construction.
Land Use Plan
The
Land Use Plan provides a blueprint of the current and future land use pattern
of
The
Town’s plan proposes a land use classification system that works in concert
with its Transportation Plan and Economic Development Plan. Once a Town Zoning
Ordinance is implemented future rezoning requests must by Indiana State Code
review the application in context of the land use plan.
Transportation Plan
The
reason for the Town's continual growth is that it is possible to enjoy a
small-town quality of life within a reasonable commuting distance of nearby
metropolitan areas. The backbone of the transportation system is U.S. 150 which
runs East-West through the town. The average commuting time to work for
Infrastructure Plan
The
sizing and location of utilities need to follow the Town's plans for
development.
From
information gathered through the Town, it appears the Town will have adequate
access to water resources to meet the future development needs of the
community.
In
terms of sanitary sewers, the Town presently does not operate or maintain a
sanitary sewer system. However, there
are two sewer treatment facilities located in the area. The New Albany-Floyd County School System
operates a small package plant for the
A
careful and thoughtful engineering and financial analysis should be considered
to determine the future sanitary sewer needs for the community. The expansion of sanitary sewers allows for
higher intensity and density of uses within an area which can have the indirect
effect of changing the rural character the Town seems to embrace. Any potential
expansion should thoroughly examine the financial, engineering, environmental
costs, public costs and benefits associated with the development of this type
of utility.
Economic Development Plan
While the
economy of the surrounding area has seen a decline in agricultural development,
The challenge is to maintain and improve the
Town's function as part of a community serving retail and service center.
Encouraging small entrepreneurs and attracting more professional service
providers in the medical, financial, and legal professions should be a main
component of the town’s economic efforts.
The lack of adequate sanitary sewer and hi-speed infrastructure limits
the development of areas as major industrial or business parks. Other areas within the County have
competitive advantages in areas such as proximity to Interstate transportation,
municipal sanitary sewer available with capacity and accessibility to hi-speed
internet connections to put the town at a significant disadvantage in the
development of these types of services.
Community Facilities and Park Recreation Plan
The
Town's existing facilities include
·
The development of a
community center;
·
The development of smaller
neighborhood parks, on the east and west segments of town. This would supplement the current park system
and provide additional recreational opportunities.
Historic Preservation Plan
The
Town's historical homes are an extremely important component of life in
A
well-designed urban environment enhances everyone's economic, social and
spiritual well-being. The plan proposes to maintain
Town of Greenville’s Statements of Policies
Per Indiana Code IS 36-7-4-502 a community’s comprehensive plan must include statements of policy for land use development, future public facilities and community land use goals. This statement of policy for land use development is the formulation of the principles that the community views as important in land use development. The Town of Greenville Statement of Policy reads as follows:
“Statement of Policy for Land Use Development”
It is the policy of the Town of Greenville Comprehensive Plan to improve the health, safety and welfare of the citizens of Greenville by providing for planned community growth in areas best suited for development while safeguarding open space, farmlands, floodplains and other natural resources and to provide other economic development opportunities along with a continued high quality of life. The plan will also provide for maintenance and development of public ways, public spaces, public lands, public structures and public utilities for the benefit of the community and in preparation for the needs of future population growth.
In considering development applications to alter the Comprehensive Plan, the Town shall have the opportunity to consider several elements necessary to ensure proper land use planning is occurring. In this consideration, the Town should review any alternation using the following criteria. Below are the elements that the Town should consider.
The second required component of the Comprehensive Plan is a statement of policy regarding the development of public ways, public spaces, public structures, and public utilities.
“Statement of Policy regarding Development
of
The Town of
INVENTORY AND ANALYSIS
HISTORY OF
Andrew Mundall,
a school teacher from

Picture of old
Paoli Vincennes Stagecoach: Courtesy of www.nafclibrary.org Archive Pictures
The old road was an important
thoroughfare in those days as it linked
During its most
prosperous times in 1900 to 1908,
John B. Ford was
a well known person from

Picture of
John B Ford: Courtesy of the
Although
Probably the
most significant historical event in
From 1970 -
2000,
SOCIAL CHARACTERISTICS
Population and
household data provides a means to analyze the past, current and future trends
within
Population and
household information has been examined and utilized to help

Table 1: Population Trends
Household Trends
According to the 1990 Census, the
average household size in the
Although the persons per
household dropped significantly from 1990 to 2000, the total number of
households has increased. In 1990 there were 183 households in

Table 2: Household Trends Census 2000
Economic Characteristics
The objective of this section is
to provide
In 2000 the U.S. Bureau of the
Census recorded that the majority of

Table 3: Employment by Industry Census 2000
According to the 2000 U.S. Bureau
of Census the median household income for
Income and education are closely
linked when analyzing economic data for a community. Almost 50% of

Table 4: Educational
Attainment: Census 2000
EXISTING TRANSPORTATION ELEMENT
Transportation in
Roadways
The roads that make up the
thoroughfare system in the
U.S. 150 is a designated arterial
roadway on the INDOT system located within
With a
projected 1.8% population growth rate,
According
to the 2000 Census, the Town had 230 single family dwelling units within its
jurisdiction. Of these units, 21 percent
of the housing stock was built before 1950, 65 percent was built before 1980
and the remaining 13 percent was built since 1980. This data suggests a high percentage of homes
are sixty years of age or old. Of the 21
percent, 17 percent of these homes were owner-occupied. The aging housing stock indicates a need for
the town to explore funding programs to renovate eligible housing stocks to
increase energy efficiency and reduce total household spending on heating.
Infrastructure Plan
The
sizing and location of utilities need to follow the Town's plans for
development.
From
information gathered through the Town, it appears the Town will have adequate
access to water resources to meet the future development needs of the
community.
In
terms of sanitary sewers, the Town presently does not operate or maintain a
sanitary sewer system. However, there
are two sewer treatment facilities located in the area. The New Albany-Floyd County School System
operates a small package plant for the
A
careful and thoughtful engineering and financial analysis should be considered
to determine the future sanitary sewer needs for the community. The expansion of sanitary sewers allows for
higher intensity and density of uses within an area. Any potential expansion should thoroughly
examine the financial, engineering, and environmental costs and benefits
associated with the development of this type of utility.
The
Town of
In the
Eastern Business District, the primary business activities would be considered
Highway Service type businesses ranging from convenience store to automobile
sales. Within this district, there are also industrial activities such as
landscaping and trucking services and, propane tank distribution business.
Small scale retail businesses are scattered throughout both districts. In the
Central Historic District, small convenience store, restaurant, bank, liquor
store, and automotive sales/services store are in operation.
The challenge is to maintain and improve the
Town's function as part of a community serving retail and service center.
Encouraging small entrepreneurs and attracting more professional service
providers in the medical, financial, and legal professions should be a main
component of the town’s economic efforts.
The lack of adequate sanitary sewer and hi-speed internet infrastructure limits the
development of surrounding areas as major industrial or business parks. Other areas within the County have
competitive advantages in areas such as proximity to Interstate transportation,
municipal sanitary sewer available with capacity and accessibility to hi-speed
internet connections to put the town at a significant disadvantage in the
development of these types of services.
The
Town's existing facilities include
The
lack of connectivity to the parks also hampers usage. The
The location of US 150 and a lack of a safe
crossing area limit the ability to use alternative modes of transportation such
as walking or bicycling to the
In
terms of other community facilities, the Town Hall is located on
The
goal is to increase accessibility of existing parks and foster partnerships
with
Historic Preservation Plan Element
The
Town's historical homes are an important component of life in
A
well-designed urban environment enhances everyone's economic, social and
spiritual well-being. The plan proposes to maintain
EXISTING LAND USE AND DEVELOPMENTAL FRAMEWORK
The following descriptions
identify those issues that have a bearing on the future development of
Central Historic Area
The Central Historic Area is an
excellent example of 19th Century linear town development with
commercial and residential uses interspersed along a tree-lined streetscape.
The main route through

Map 1:
The
boundaries of the Central Historic Area are defined by
A few historic structures are
located within this area, most notably the Greenville Lodge from 1850 and the
Jesse Smith House from the 1860’s. As a result of the fire in 1908, however,
the majority of buildings are from the early 1900’s. The historic structures
are generally in fair condition and provide a potentially unique focus for the
character of
U.S. 150 offers excellent access to this area. However, safety is an issue along the highway due to high speed traffic, very limited parking lots, and pedestrians crossing the road in unpredictable locations and commercial areas.
Land use and development
opportunities do exist in this area. The
recognition of the historic character of the central
The Town can promote commercial
uses within existing unoccupied commercial structures and should work with
State officials in addressing the safety of pedestrians and vehicles along U.S.
150. Safety along this corridor is an
issue to the citizens of
In addition, a “Welcome to
Land use along the eastern US 150 corridor is a mix of commercial and light industrial uses with a splattering of residential dwelling. Strip commercial development lines the eastern potion of the corridor. Driveways typically have direct access onto the roadway and development has occurred in an unorganized manner.
Residential uses typically front onto US 150 within the older central portion of the corridor. Vehicular access to these lots is accomplished primarily by the use of alleys. Small tracts of farmland and undeveloped open space occur occasionally along the entire length of US 150, providing views into open cultivated fields and the wooded floodplain.

Map 1: US 150
Corridor in
The need for a unified sign standard will assist advertising along the roadway while also creating a sense of place for the town.
Western Residential Area
This area extends west of
Eastern Residential Development
This area extends east of the US
150 Business Corridor following US 150 to the corporate limit line. Land uses
are primarily residential. The age of
the housing stock ranges from early 1900 to present day. Agricultural land to
the north has experienced limited development. Residential subdivisions have
developed with access of US 150.
PROPOSED LAND USE
The following descriptions
illustrate general land-use scenarios for future development within
Residential Land Use
Residential land use of defined as land that is primarily used for the construction of residential buildings and public facilities that support residential areas such as schools and churches. The proposed Land Use Plan delineates general areas for the expansion of existing residential areas.
Such future expansion would most likely be in areas where subdivision tracts are developed on land sold to developers by families in the area. These types of developments will need to be coordinated with the Greenville Town Council since the houses and families they bring into the area will greatly impact the road conditions, school capacity and services currently provided by the town.
Multi-family residential uses area not specifically identified on the Land Use Plan based on the present lack of adequate sanitary sewer service which would be required for this type of intensity and density of development. If such higher density residential development is allowed, it should be adjacent to US 150 corridor and be located in or adjacent to the US 150 Business Corridor as described previously. New multi-family development should be located within transition areas between singe family residences and commercial and industrial uses. Appropriate screening and landscaping should be developed to buffer adjacent land uses.
The commercial-use designation includes retail, professional and business services and offices, restaurants, auto sales and service and personal establishments. Commercial designations on the proposed Land Use Plan typically represent existing commercial development and are indicated on the Land Use Map in red.
No expanded commercial uses are
shown within the corporate limits of
Industrial uses are indicated in purple. The industrial-use designation includes manufacturing, wholesale, warehousing, distribution, solid waste facilities and salvage. Any future development or redevelopment of industrial lands will need to consider traffic, noise, proximity to residential uses, and the capacity for sanitary sewers. Also, due to the lack of competitive advantages in industrial development with other areas of the county, any new industrial development will need to indicate how it can overcome the competitive advantages of sewer capacity, internet capacity and proximity to major transportation corridors.
Recreation and
Parks, recreation areas, nature
preserves, erosion control areas, unique woodlands and wetlands are land uses
included in this category. Connectivity to

TRANSPORTATION PLAN ELEMENT
The availability of transportation routes throughout the jurisdiction has largely determined the manner in which the area has developed. It is the intent of the Transportation Plan to anticipate the future needs of this system. The overall goal of this section is to make recommendations based on these needs to insure the safe and efficient movement of people and goods.
Transportation routes are not typically limited by the political boundaries of the cities, towns, townships, and counties. Therefore, roadways act as lines of connection between differing areas. This plan will offer an overall look at the system and will aid in the efforts of the town and county to plan future improvements. The transportation plan has been formulated based on the conditions of existing circulation outlined earlier, and in light of the needs of the proposed land uses outlined in the Land Use Plan.
Roadway development standards are necessary in order to ensure that the type of roadways specified meet a particular transportation need. The Transportation Plan is based on accepted State and national standards which describe the level of use that a particular roadway should accept.
The Transportation Plan element map graphically depicts the location of various roadway classifications. The classifications remain largely the same as those described earlier in Chapter 1.
US 150 offer
With increasing development in
and around the
Road improvements to several
locations are necessary within
INFRASTRUCTURE PLAN ELEMENT
As previously stated, the Town should carefully and thoughtfully analyze the prospective of introduction of sanitary sewer into the Town. A well-defined cost analysis should be considered in the decision-making process as well as long-range effects in terms of development trends, operational cost, and spurring higher density development. In this review, the concept of conservation design should be considered as a planning and development tool to balance density and rural character.
ECONOMIC PLAN ELEMENT
The Town should consider the creation of a Main Street Organization to heighten aware of the businesses in the Central and Eastern districts. A detailed marketing and needs analysis should be considered in attempting to foster more professional based businesses to locate in the Town. Beautification programs along US 150 and place making activities such as holiday banners, street art, and welcome signage should be considered as a way to reinforce the uniqueness of the Town.
COMMUNITY FACILITIES AND RECREATION PLAN ELEMENT
The Town should consider the development of safe routes to school program. This program develops safe routes for children to walk and bicycle to school. The lack of these facilities and the current speed limits established by INDOT hinder the development of pedestrian mobility in the community.
In terms of parks, the Town should consider any new development over a certain acreage or density require a set aside of land for parkland. The Town should consider the feasibility of the creation of a community center facility located near the school or park to increase community involvement. In addition, the Town should consider participating in the development of the County’s designated bicycle route that enter the Town.
HISTORIC PRESERVATION PLAN ELEMENT
A top priority of the Town should be the creation of zoning tools in the Central District to ensure the character of the Town are not lost during re-development. One alternative would be the creation of a mixed use zoning district that would allow property owners flexibility in certain residential and commercial uses within the community. Any redevelopment should require a formal process similar to a planned unit development approach which would provide the community with a greater level of input.
Also, the Town should consider
the development of municipal preservation commission. The Town should explore the feasibility of
how this authority could protect the unique historic features of
GOALS, OBJECTIVES AND IMPLEMENTATION STRATEGIES
The comprehensive Plan portrays
an idealized vision of
The recommendations are presented
as specific strategies necessary for the implementation of the goals and
objectives of the citizens of
Goal 1: Transportation
U.S. 150 is a major arterial that
runs through the town and severely hinders community connectivity. Drivers are
confused by the various speeds posted throughout town ranging from 50 to 25
MPH. As a result, the speeds on US 150
make pedestrian travel extremely unattainable especially at
Objective: Increase local
automobile and pedestrian safety
Strategy: Work with INDOT to reduce speed limits in Central District
Strategy: Work with INDOT and other State officials to review placement of speed limit zones and rational on their requirement.
Strategy: Install sidewalks along US 150 to increase safety and provide an alternative mode of transportation for local residents. The Town should seek grant money for pedestrian improvements
Strategy: Encourage landscaping throughout downtown to maintain rural character and provide a strong sense of place.
Strategy: Investigate the feasibility of curbouts or traffic
islands to provide pedestrian travel with safe areas in order to transverse the
Town especially improved pedestrian crossing at
Objective: Improve dangerous
intersections along US 150
Strategy: Work with INDOT to identify most dangerous intersections
and possible state improvements; suggest moving intersections of
Strategy: Increase safety at
Goal 2: Revitalize Downtown
In meetings with the town, residents have expressed a desire to remain a rural town. They realize their proximity to larger metropolitan areas mean that there will be growth, and are creating a comprehensive plan in order to regulate growth fitting with their small-town character. They also want to encourage small neighborhood businesses along US 150 in their downtown. They want to create a stronger sense of community through civic projects and competitions.
Objective: Maintain town’s
architectural integrity
Strategy: Create architectural guidelines for new downtown construction which detail acceptable housing styles, materials, and design
Strategy: Utilize Floyd County Historical Structures survey for identifying important structures in town
Strategy: Mandate conformance for new construction to height and width requirements established in the zoning ordinance
Strategy: Establish the manner in which buildings are expected to relate to and shape the space between them;
Objective: Strengthen the City’s
economic base by stimulation of conservation and reuse
Strategy: Apply for restoration grant money for renovating neglected houses and vacant lots ensuring the preservation of property values through Town
Strategy: Encourage landscaping along downtown corridor; involve citizens through contests
Strategy: Promote the use of historic landmarks to attract visitors
Strategy: Hang town flags from telephone poles along corridor in downtown
Strategy: Involve school children landscaping and historic projects within community
Strategy: Involve residents in seasonal street cleanup
Objective: Encourage pedestrian
traffic in downtown area
Strategy: Improve bike and pedestrian safety through identifying key pedestrian and bike corridors
Strategy: Install benches for residents along sections of these corridors
Strategy: Connect businesses, residences, and parks with pedestrian trails or signs with maps on them
Strategy: Install community art and place-making projects involving local residents and schools
Strategy: Create a community meeting place for a message board and starting place for activities
Objective: Maintain integrity of
housing stock in
Strategy: Apply for CDBG and HOME funding to provide money for rehabilitation projects
Strategy: Apply for entrance to the in the Indiana Main Street Program to expand community enhancement opportunities
Strategy:
Encourage and aid citizens wishing to list buildings on the National Register
for Historic Places; list
Goal 3: Infrastructure
Currently
Objective: Determine the best
alternative approach to sewage treatment for
Strategy: Conduct a preliminary engineering feasibility report that would determine a best method approach to providing sewage treatment to the Town. A key element of any report should contain a cost benefit analysis and growth analysis to determine a method which would not dramatically alter Town’s rural character.
Objective: Stormwater runoff
issues
Strategy: Fund a feasibility study for stormwater drainage issues
in
Strategy: Acquire flood prone land for parks or open spaces
Strategy: Encourage and educate on the use of rain gardens for businesses prone to flooding
Objective: Determine if there is
a need for park and ride/rural transit in
Strategy: Conduct a survey for a Park & Ride program or on-call bus network
Strategy: Identify potential grant sources for mass-transit and potential sites for these services
Objective: Establish a municipal
parking lot
Strategy: Determine available plots of land, work with owners to acquire and pave as a parking lot
Strategy: New businesses along US 150 should provide parking behind their buildings to maintain cohesive downtown facade
Goal 4: Parks and Open Spaces
Currently
Objective: Add more activities
for youth and seniors
Strategy: Coordinate with Floyd County Parks Department on outdoor
activities in
Strategy: Identify local wildlife and create tours for all age groups pointing out these birds/flowers/trees
Strategy: Seek grant monies for more parks equipment in the town park
Strategy: Examine suitable sites for a community center, explore funding opportunities
Strategy: Explore funding options for bike trails/pedestrian trails to connect subdivisions and the town
Objective: Retain rural character
around city limits
Strategy: Create a conservation district or a greenbelt around town
Strategy: For new developments require conservation subdivision design
Appendix
Implementation Matrix
Land Use Maps
Goal 1: Housing
|
Community Policy |
Implementation Steps |
Responsible Parties |
Time Frame |
Measurement of success |
|
Establish
zoning regulations to implement comprehensive plan |
Draft
new ordinance for new zoning districts |
Municipal
Plan Commission
|
Fall
2009 |
Passage
of new zoning ordinance |
|
Entrance
in |
Apply
for entrance using Floyd County Historic Structures inventory |
Town
Council Organization
of a Main Street Group |
Fall
2009 |
Acceptance
as into |
|
Town/citizens
list buildings on National Register for Historic Places |
Simplify
application process Conduct
informational meetings to assist applicants |
Town
Council Historic
Society of Historic
Landmarks of |
Fall
2010 |
Acceptance
of downtown/buildings to National Register |
|
Determine
eligibility for CDBG and HOME funding |
Complete
income survey of town |
Town
Council |
Spring
2009 |
Completion
of survey |
Goal 2: Transportation
|
Community Policy |
Implementation Steps |
Responsible Parties |
Time Frame |
Measurement of success |
|
Establish
continuous 35mph speed limit |
Work
with INDOT and State elected officials |
Town
Council |
Fall
2009 |
Posting
of new speed limit |
|
Continuous
sidewalks in downtown area |
Work
with INDOT and State elected officials |
INDOT Town
Council |
Fall
2010 |
Sidewalks
throughout downtown |
|
Landscaping
throughout downtown area |
Implement
community planting activities |
Town
Council |
Continuous
process |
|
|
Establish
pedestrian crossing at |
Prepare
study on feasibility of various crossing types |
INDOT Town
Council |
Spring
2009 |
Passage
of appropriate crossing |
Goal 3: Infrastructure
|
Community Policy |
Implementation Steps |
Responsible Parties |
Time Frame |
Measurement of Success |
|
Determine
feasibility of best method for sanitary sewer development plant |
Conduct
cost-benefit analysis, feasibility study |
Town
Council |
Fall
2010 |
If
financially feasible and desired by community, determine best course of
action |
|
Conduct
study of flood prone areas in |
Explore
options to reduce flooding |
Town
Council |
Fall
2010 |
|
|
Acquire
flood prone land for parks or open spaces |
|
Town
Council |
Ongoing
process |
Preservation
of environmentally sensitive areas |
|
Identify
funding sources for improvements |
Identify
local, state, and federal funding opportunities |
Town
Council |
Ongoing
process |
|
|
Promote
use of rain gardens/rain barrels |
Develop
a public outreach program |
County
Ag. Extension Town
Council |
Fall
2010 |
Public
Workshops |
|
Determine
need for public transit |
Conduct
a feasibility analysis |
Town
Council |
Fall
2011 |
|
|
Identify
suitable parking lot site |
Prepare
preliminary study of suitable parking areas in town |
Town
Council |
Fall
2010 |
Municipal
Parking Lot |
Goal 4: Parks
and Open Spaces
|
Community Policy |
Implementation Steps |
Responsible Parties |
Time Frame |
Measurement of Success |
|
Partner for more activities for youth and seniors |
Development of activities program |
Floyd County Parks Department, Town Council |
Winter 2009 |
|
|
Determine suitable site and funding for community
center |
Conduct feasibility study of sites and determine
possible funding sources |
Town Council |
Fall 2012 |
Procurement of funding and site |
|
Determine suitable sites and funding for trail
network |
Research possible funding and position of trail
system |
Town Council |
Summer 2010 |
Public Meetings |
|
Create a conservation area around town |
Determine feasibility and evaluate potential
growth |
Town Council |
Fall 2010 |
Passage of new zoning district |
Goal 5:
Revitalize Downtown
|
Community Policy |
Implementation Steps |
Responsible Parties |
Time Frame |
Measurement of Success |
|
Identify and preserve historical structures |
Develop a town preservation plan for historic
structures |
Town Council Public |
Ongoing |
Pubic Forums |
|
Promote and encourage community spirit |
Develop community beautification plan |
Town Council |
Fall 2009 |
Decrease in commercial and residential vacancies |
|
Create a landscaping plan |
Determine suitable plants and involve community
in planting |
Town Council Public |
Spring 2010 |
Implementation of program |
|
Conduct pedestrian study on improvements for
pedestrians in town |
Create inventory of improvements and affected
areas |
Town Council |
Fall 2009 |
More pedestrian activity |
|
Promoting community art |
Network with resident artists and school |
Town Council |
Fall 2009 |
|
|
Install community board |
Network with residents |
Town Council |
Fall 2009 |
|
Community Needs Assessment
Public Participation
The Floyd County Parks Plan Department employed several participation
methods to ensure public input in the planning process. The department conducted a community-based
survey, held two public input meetings, various stakeholder meetings.
Survey
In an effort to better understand residents’
current attitudes and interests with regard to Greenville’s comprehensive plan;
conducted a mail survey of residents in late fall 2008. The mailing list composed of
The data was analyzed looking at
the county as a whole and then looking at the city in comparison to the rest of
the county. The survey was designed by
Mr.
General
Discussion
The survey results suggest that overall citizens
are satisfied with the Town of
In general the community seems satisfied with
how it is now. Over half of the
community agreed or strongly agreed with the statement that they are satisfied
with
The responses to this set of questions, while more positive than negative suggest that many respondents would like to see small changes made to enhance the community. This response is further supported by many of the suggestions made in the open-ended portion of the survey.

2. I would prefer to preserve




6. I would prefer new developments to be located where infrastructure already in place.

7. I would prefer retail and restaurants to be located closer to my home.

8. I would prefer employment opportunities closer to home.

9. I would prefer the community have strong land use policies and regulations.

10. I would prefer slower traffic on US 150.

11. I would prefer more transportation options in

12. I would prefer a community landscaping program along US 150.

Section Two
Community members were asked to rate the importance of
several projects from 1 to 12. We used the results to show what was most
important to
Most important:
Preserving natural and historic resources
Improving traffic flow throughout the community
Providing additional ambulance/fire services
Creating new parks and recreation facilities
Creating an interconnected system of trails
Developing comprehensive approach to
wastewater/stormwater treatment
Developing a community landscaping program along US 150
Developing a branch library
Having a variety of housing types and prices
Attracting new retail businesses and restauraunts
Attracting new businesses and employers
Attracting new residential development
Least Important
Increase
taxes or fees
In the open-ended portion of the survey the most
frequently mentioned item was a concern about raising taxes. In light of this concern, the response to the
“tax increase to fund” questions should be interpreted not so much as a green
light to increase taxes, but as an indicator of importance to the community.
The responses confirm a desire to keep
1: Attracting new businesses: 72 No, 17 Yes, 1 no response
2. Creating a community landscaping program along 150: 59 No, 30 Yes
3. Creating a system of walking trails: 59 No, 12 Yes
4. Developing a branch library: 59 No, 30 Yes
5. Providing sewer expansion to the community: 65 No, 22 Yes
6. Improving traffic flow and roads: 45 No, 43 Yes
7. Preserving natural and historic resources: 54 No, 35 Yes
8. Providing additional ambulance and fire services: 51 No, 37 Yes
9. Protecting agricultural lands: 44 No, 45 Yes
Of the respondents 82 lived in
The majority of
residents have lived in

I live in
Most Important
Safe Community
More rural setting
Better school district
Close to family/friends
Lower Tax Rates
Close to work
Better community services/facilities
Least Important
Demographics of the respondents were the majority were older (38 are 45-64 and 30 are over 65) and 48 Male, 36 Female responded. The average number of people living in a household is 2.8 and the average number of children under 18 in the household is .6 so an older community.

Open-Ended
Question Content Analysis
The following were the most commonly expressed
concerns or opportunities by the respondents in the open-ended portion of the
survey.
1. Opposition to sanitary sewer
2. Opposition to expansion of US 150
3. No new taxes
4. Lower the speed limit
5. Stop light at
6. Clean up
7. No new development
Survey
Conclusion
The results of the survey are very encouraging.
An overall interpretation of the results would suggest a supportive community
interested in selective enhancements and modest expansion. Respondents did identify a major problem with
traffic along US 150, but did suggest opportunities for improvement. The results indicate strong support for a
Comprehensive Plan. Overall the results suggest that residents are satisfied
with the community as a whole and are committed to solving any problems
constructively. The main area of concern is the traffic and possible expansion
of US 150 and the effect on the town.
Public Forums
The Floyd County
Plan Department conducted two public input meetings during the development of
the Comprehensive Plan. Below is a
synopsis of each meeting including discussion items, number of public participating
and location of the public meeting.
Public Meeting #
1
January 10, 2009 9 am
Attendance: 10
Main discussion
items:
Public Meeting #
2
March 12, 2009 7PM
Attendance: 7
Main discussion
items: